Alfredo Harp Helú Baseball Stadium
Werner Sobek was responsible for the structural engineering of the Alfredo Harp Helú Baseball Stadium in the north-east of Mexico City. The stadium for the local club Diablos was built in an existing sports park and has a capacity of approx. 16,000 visitors.
Exciting Structure, Floating Roof
The U-shaped ground plan is adapted to the shape of the pitch. The stadium tiers were covered with a wide cantilevered roof that – contrary to the orientation of the tiers – seems to float above the stadium in a stringent north-south alignment.
After three years of construction, the Alfredo Harp Helú baseball stadium was opened in summer 2019. Both President Andrés Manuel López Obrador and Mexico’s mayor Claudia Sheinbaum were present at the inauguration on 23 March.
Architecture
Francisco Gonzalez-Pulido, Chicago/USA
Planning time
2014 − 2016
Construction time
2016 − 2019
Services by Werner Sobek
Structural engineering, concept design – tender documents
GFA
77,800 m²
Client
Jahn, Chicago/USA
Photography
Rafael Gamo, New York/USA