Ems-Brücke K 2
Werner Sobek was commissioned to design a new bridge over the River Ems, which is to be built in the district of Steinfurt between Saerbeck and Emsdetten. The structure crosses the floodplain in an even curve with a constant longitudinal gradient.
Project Planning and Structural Design from a Single Source
After examining several variants, the decision was made in favour of a carriageway bridge with a steel composite superstructure and tree-like supports.
Architecture
Werner Sobek, Stuttgart (DE)
Planning time
2023 – 2024
Construction time
2025 – 2026
Services by Werner Sobek
- Object planning (WP 1– 3 + 6 acc. to HOAI)
- Structural engineering (WP 1– 3 + 6 acc. to HOAI)
Bridge area
752 m²
Client
Kreis Steinfurt (DE)
Renderings
Werner Sobek, Stuttgart (DE)