Lindenplatz Metzingen
The commercial building at Lindenplatz in Metzingen an der Erms is an ensemble of three buildings. Their floor plans are oriented to the course of the street and the river. Werner Sobek was responsible for the facade and structural engineering of the project.
Course of Street and River demand Complex Geometry of Ground Plan
The buildings consist of three upper floors and a connecting basement. Their facade is divided into a rear-ventilated brick facade and a two-storey curved insulated glazing. Both follow the complex geometry of the floor plan.
Architecture
Riehle + Assoziierte, Reutlingen and Stuttgart/Germany
Planning time
2003 − 2004
Construction time
2004 − 2005
Services by Werner Sobek
- Structural engineering (WP 1 − 7 acc. to § 64 HOAI)
- Facade engineering (WP 1 − 8 acc. to UBF)
GFA
6,500 m²
Client
Holy AG, Metzingen/Germany
Photography
Wolfram Janzer, Stuttgart/Germany