Riederwald Pedestrian and Cycle Bridge
With a span of 53 m, the integral structure spans the A66 motorway in one go. The foot and cycle path bridge elegantly connects the Frankfurt districts of Seckbach and Bergen-Enkheim with the Fechenheimer Wald recreation area.
Integral Structure Connects City & Recreation Area
Reinforced concrete cantilevers extend the two abutments, which are founded on drilled piles, towards the carriageways. The central steel cross-section of the structure consists of two lateral hollow sections. Between them is the orthotropic carriageway slab, which is flexurally rigidly connected to the cantilevers.
Architecture
Werner Sobek, Stuttgart (DE)
Planning time
2020 – 2021
Services by Werner Sobek
- Object planning, structural engineering (WP 2 –3 acc. to HOAI)
- Structural engineering (WP 2 –3 acc. to HOAI)
- BIM main and discipline coordination
(Demand Planning; Visualisation; Coordination of Disciplines; Planning Process Control and QA/QC – Consistency Control; Structural Analysis and Verification; Derivation of Drawings and Documents; Quantity Take Off and Cost Analysis/Estimation)
Bridge area
308 m²
Client
Die Autobahn GmbH des Bundes, Gelnhausen (DE)
Photography
Werner Sobek, Stuttgart (DE)