Terminal 3 Frankfurt Airport
A brand new terminal is being constructed at Frankfurt Airport on the site of a former US Air Base (home to the CargoCity South logistics hub today). Werner Sobek is responsible for carrying out a host of duties for this extraordinary project, ranging from the creation of draft plans and technical designs through to the production of tender documentation for planning the terminal’s facades.
The new terminal includes a check-in hall, airport security, border controls, the ‘Marketplace’ retail concourse, an arrivals zone and areas for baggage handling and baggage reclaim.
One of the Largest Infrastructure Projects in Europe
A vast assortment of facade technologies and materials (including steel, glass, aluminium, tiles, ceramic, natural stone and render) are being used to create the new terminal’s facades.
Upon completion, 19 million passengers will stroll through the Marketplace, relax in the lounges and arrive and depart via the terminal’s three gates every year. During its construction, Terminal 3 has been one of the largest infrastructure projects in Europe.
Architecture
Design architect: Mäckler Architekten, Frankfurt am Main (DE)
Execution object planning: ARGE Wenzel + Wenzel terra.nova, Karlsruhe (DE)
Planning time
2015 – 2022
Construction time
2018 – 2024
Services by Werner Sobek
Facade engineering (main terminal building, security checkpoint, marketplace, Pier H and Pier J, Tower, passenger transport system station) (WP 2 – 8)
GFA
ca. 320,000 m²
Client
ARGE Wenzel + Wenzel terra.nova, Karlsruhe (DE)
Renderings
Fraport AG, Frankfurt am Main (DE)